Namestone Rockfall Geotechnical Protection, VIC

The site at Namestone suffered significant geotechnical instabilities due to a landslide in 2020. RAM were engaged to undertake emergency Rockfall Protection works.

ROCKFALL PROTECTION

CLIENT: FULTON HOGAN

LOCATION: GREAT ALPINE ROAD,VIC

DESIGN:  ROCKBOLTS, ROCKFALL DRAPES, ROPE ACCESS

PROJECT OVERVIEW

The site at Namestone suffered significant instabilities due to a landslide in 2020. The Pinnak Sandstone is highly fractured causing collapsing ground and large wedges that have undergone relaxation presenting a significant Rock Fall Hazard to motorists.

SOLUTION

 

Rix Asset Maintenance (RAM) were contracted to undertake the installation of post tensioned ground anchors, rock bolts and rock fall mesh. This is the first project in Australia to use self-drilling anchors with a sheathed free length for post tensioning which achieves the 100-year design life requirements.

Due to relaxation of wedges RAM redesigned the system to incorporate Geobrugg Spider Mesh.

•        Self Drilling Anchors

•        Rock Bolts

•        Coir Matting

•        Rockfall Mesh Drape

•        Spider Mesh

•        Rope Access Scaling

•        Self Drilling Anchors

•        High Reach Drilling